Factory Price High Quality ASTM A53 A106 Gr.B Seamless Steel Pipe 6m Length Carbon Steel Pipe
- Overview
- Recommended Products

Product Paramenters
Seamless Steel Pipe | ||
Seamless Pipe | China | GB/T8162/T8163 GB5310/6579/9948 |
U.S.A. | ASTM A53/A106/A178/A179/A192/A210/A213/A333/A335/A283/A135/A214/315/A500/A501/A519/A161/A334; API 5L/5CT | |
Japan | JIS G3452/G3454/G3456/G3457/G3458/G3460/3461/3462/3464 | |
German | DIN 1626/17175/1629-4/2448/2391/17200 SEW680 | |
Russia | GOST 8732/8731/3183 | |
Material and Grade | China | 10#, 20#, 16Mn, 20G, 15MoG, 15CrMo, 30CrMo,42Crmo, 27SiMn, 20CrMo |
U.S.A. | Gr. B/Gr.A/A179/A192/A-1/T11/T12/T22/P1/FP1/T5/4140/4130 | |
Japan | STPG38,STB30,STS38,STB33,STB42,STS49,STBA23,STPA25,STPA23 | |
German | ST33,ST37,ST35,ST35.8,ST45,ST52,15Mo3,13CrMo44, 1.0309, 1.0305, 1.0405 | |
Russia | 10, 20, 35, 45, 20X | |
Out Diameter | 10-1000mm | |
Wall Thickness | 1-80mm | |
Length | 1-12m | |
Protection | Plastic caps | |
Packing terms | Labeled and bundled together with steel strip | |
Shipment terms | Containers or bulk by sea,one 20" container can load about 27 tons max (5.8meters long),one 40" container can load about 28 tons max(less than 11.8meters long) | |
Quality Certificate | ISO, API, Mill Test Certificate | |
Surface Treatment | Black painting/varnished surface,anti-corrosion oil, galvanized or as per required by customer |
Technique | Hot Rolled/Cold Drawn |
Steel grades | Q195, Q235A-B, Q345A-E, 20#, 10#,16Mn, ASTM A36,ASTM A500, |
ASTM A53, ASTM 106, SS400, St37, St52, S235JR, S355TRH ect. | |
Standards | GB/T 3091-2001,GB/T13912-2002, BS 1387, ASTM F1083 ect. |
Pipe ends | plain, beveled, threaded, socket with holes, with PVC clap/ coupling/ clamp, |
or as customers' requirement | |
Application | liquid delivery (pump well, gas, water), construction pipe, structural |
pipe(greenhouse structure, fence post), curtain wall, machinery part ect. | |
Delivery Time | 10days from stock; 15-20days produced according to the qty |
Payment Term | T/T or L/C |
Price Term | CIF; CFR; FOB |
Loading Port | Qingdao port Tianjin port Shanghai Port China |



Quality Inspection


(1) After production, 4 QC personnel with more than 5 years of experience randomly inspect the products.
(2) National accredited laboratory with CNAS certificate
(3) Accept inspection from a third party designated/paid by the buyer, such as SGS, BV.
(4) We have UL, ISO9001/18001, FPC certificates.
(3) Accept inspection from a third party designated/paid by the buyer, such as SGS, BV.
(4) We have UL, ISO9001/18001, FPC certificates.
Customer Feedback

Company Profile

Liaocheng Mingxing Pipe Manufacturing Co., Ltd.: The Backbone of Steel, Connecting the World In the world of steel, Liaocheng Mingxing Pipe Industry Manufacturing Co., Ltd. has risen rapidly since its establishment in 2016. This is a pioneering enterprise that integrates modern production and trade, with a keen focus on the global market. Entering the factory, large machinery operates in an orderly fashion, producing a variety of steel products such as seamless steel pipes, square pipes, galvanized pipes, steel plates, rebar, steel coils, and color-coated steel plates, all forged through exquisite craftsmanship. From the foundation of buildings to the arteries of industry, the products are of exceptional quality and performance, standing as solid pillars in various fields.
The professional sales team is approachable and keen, while the R&D team is dynamic and innovative. Together, they precisely interpret customer needs and recommend the best product models. Adhering to the philosophy of "keeping pace with the times, progressing with our customers," the company paves the way with high-quality products, builds bridges with integrity, offers warm services, and provides fair prices. The first-class marketing team conquers the market.
With advanced production lines that ensure efficient output, stringent quality control, and meticulous cost management, this strength has caught the attention of the global market. Our products, like carrier pigeons, fly to Southeast Asia, the Middle East, South America, Eastern Europe, Africa, Australia, and many other regions. The company upholds the principles of "Integrity, Innovation, Dedication, and Mutual Benefit," and we look forward to establishing long-term cooperative relationships with domestic and international customers. We welcome both new and old clients to contact us and build future business partnerships, achieving mutual benefit and shared development.

Qualification Certificate

Production Process

APPLICATION

Stainless steel pipes are widely used in industries like oil and gas, construction, food processing, chemicals, automotive, aerospace, medical, power generation, energy, and water treatment for their durability, corrosion resistance, and strength.

FAQ
Q: How can we trust your company?
A: We specialize in steel business for many years, you are welcome to investigate in any way,anyway, you can place an order on Alibaba, with trade assurance, which can ensure your payment.
Q. How do you guarantee the quality?
A:①We have passed ISO9001, SGS, CE and other certifications;
②Always have pre-production samples before mass production,and always do final inspection before shipment;
③ Acceptable third-party inspection.
Q: About the product price?
A: Due to the cyclical changes in raw material prices, prices vary from period to period. You can consult us, you can communicate with us online through the platform, WeChat, WhatsApp and other platforms, and we will reply within 24 hours. Please give us your requirements and specifications (steel grade, size, quantity, destination port), and we will work out the best price at the first time.
Q: Can I visit your factory?
A: Of course, we welcome customers from all over the world to visit our factory. However, some factories are not open to the public.
Q: Can you send samples?
A: Of course, we can send samples to all over the world, our samples are free, but customers need to bear the express cost.
Q: How long is your delivery time?
A: Generally speaking, our delivery time is within 15-45 days, if the demand is particularly large or there are special circumstances, the delivery time may be delayed.
